Jumat, 19 Maret 2010

Informasi Umum Pelabuhan

PELABUHAN LHOKSEUMAWE

INFORMASI UMUM

Nama Pelabuhan

: Pelabuhan Lhokseumawe

Alamat Pelabuhan

: Jl.Pelabuhan Umum Kreung Geukueh
Kelurahan : -
Kecamatan : -
Kabupaten/Kotamadya : Aceh Utara
Propinsi : : ACEH
Status Pelabuhan : Pelabuhan Umum
Jenis Pelabuhan : Pelabuhan Konvensional
Kode Pos : 24354
Telepon : (0654) 56373, 48201
Faximile : (0654) 56022
Email : -
Website : www.Lhokseumaweport1.co.id
Telex / VHF : -
Kelas Pelabuhan : II (dua)
Kepanduan
Status Pemanduan :
Sarana Pemanduan :
Koordinat Pelabuhan : 05°10'15”LU / 07°09'27”BT

ALUR PELAYARAN & LAIN LAIN

Panjang

: 2.5 Mil

Lebar

: 250 M
Kedalaman : 10 mLWS
Pasang Tertinggi : 2.30 mLWS
Pasang Terendah : 0.10 mLWS
Jumlah Dermaga : 3 buah
Lapangan Penumpukan : 20.158 M2
Gudang : 2.600 M2
Kolam Pelabuhan
Luas : 1.100.000 M2
Kedalaman : 6 10 M LWS

Pelabuhan Lhokseumawe

Kembangkan Pelabuhan di Aceh Butuh Rp 350 M

Rabu, 21/10/2009 - 08:00 WIB

November, Pelabuhan Sabang Dilimpahkan Ke BPKS

BANDA ACEH - PT Pelabuhan Indonesia (Pelindo) I memasukkan pengembangan pelabuhan di Aceh dalam rencana strategis lima tahun ke depan. Prioritas diperuntukkan untuk pengembangan Pelabuhan Malahayati, Meulaboh, dan Pelabuhan Lhokseumawe. Dana yang dibutuhkan diperkirakan mencapai Rp 350 miliar.

“Jika proses pembangunan berjalan lancar, kesemua pekerjaan itu akan dapat diselesaikan dalam waktu tiga tahun,” kata Direktur Komersial dan Pengembangan Usaha PT Pelindo I, Bambang Cahyana, kepada wartawan, usai acara ekspose pengembangan pelabuhan di Aceh, Selasa (20/10), di Hotel Hermes Palace, Banda Aceh.

Pelindo telah menyiapkan pelabuhan Meulaboh menjadi pelabuhan pengangkutan untuk crude palm oil (CPO). Investasi dilakukan mulai 2010 dengan membangun instalasi handing CPO terpadu, mulai dari tankstorage, pipa, pompa, dan yang lain. Dana yang dibutuhkan sekitar Rp 100 miliar. “Pembangunan diharapkan selesai dalam setahun. Awal 2011, ekspor CPO sudah bisa langsung dari Meulaboh tanpa harus melalui Belawan lagi,” ujar Bambang.

Malahayati juga akan dipoles menjadi pelabuhan peti kemas dengan area parkir kapal (sea way) seluas 11 hektare. Dana yang dibutuhkan juga sekitar Rp 100 miliar. Pekerjaan sea way ini mulai dilakukan pada awal 2010, termasuk perluasan area parkir kapal dan peti kemas. “Saat ini, sebetulnya dermaga dan alat sudah ada. Tapi kalau sea way-nya sendiri tidak siap, makanya arus peti kemas tidak akan tumbuh dengan baik, jadi kami akan lakukan pengerasan sea way. Kami targetkan dalam waktu dua tahun Pelabuhan Malahayati benar-benar bisa menjadi pelabuhan peti kemas,” ujarnya.

Sedang untuk Pelabuhan Lhokseumawe, disiapkan menjadi terminal terpadu. Baik untuk pusat logistik dan distribusi bahan kebutuhan di Aceh, terminal penunjang industri migas, dan pusat distribusi industri. Rp 150 miliar lagi dibutuhkan untuk mewujudkan rencana tersebut. “Untuk pelabuhan Lhokseumawe sudah ada investornya. MoU sudah ada, tinggal start saja. Pembangunan akan dilakukan pada kwartal I atau paling lambat di kwartal dua tahun 2010. Jika lancar, keseluruhan pelabuhan akan selesai dalam waktu tiga tahun,” sebut Bambang.

Pembangunan ketiga pelabuhan tersebut dimulai dengan dana awal dari pelindo serta mengajak investor untuk menambahkan modal. Karena itu, Pelindo mengharapkan dukungan dari Pemda untuk memberikan iklim yang kondusif supaya investor dan pelindo tidak menemui kendala saat membangun pelabuhan. “Pemerintah Aceh hendaknya jangan menjadikan pelabuhan sebagai sumber Pendapatan Asli daerah atau PAD. Itu yang penting, Pemda Aceh harus melihat pelabuhan sebagai motor penggerak ekonomi. PAD baru diambil jika ekonomi di pelabuhan sudah tumbuh,” tandasnya.

Pelabuhan Sabang
Sementara itu, mengenai pengalihan aset pelabuhan sabang, Bambang mengatakan kalau pelimpahan aset telah disetujui Kantor Kementerian BUMN dan berkasnya juga sudah turun. “Targetnya mungkin akhir November 2009 pengalihan aset sudah selesai dilakukan,” kata Bambang. Pengalihan aset rencananya dilakukan melalui skema hibah koperasi. Saat ini sedang diinventarisir aset-aset apa yang ada di Sabang. “Kami sudah bertemu dengan beberapa teman di BPKS dan DKS untuk mendaftar aset Sabang, kemudian akan kami bawa ke Medan untuk dicocokkan. Jika sudah cocok langsung akan dibuat perjanjian serah terima aset,” tambahnya.

Wakil Gubernur Aceh, Muhammad Nazar, menyatakan sangat mendukung upaya Pelindo ini. “Selama ini keinginan masyarakat dan Pemerintah Aceh memiliki pelabuhan yang aktif bagai mimpi di siang bolong. Mudah-mudahan keinginan ini tidak hanya terus sekedar rencana dan Aceh segera bisa memiliki pelabuhan yang benar-benar produktif,” ujarnya.

Menurut dia, dibutuhkan keseriusan dari semua pihak untuk mengelola pelabuhan di Aceh, fasilitas dan infrastruktur harus memadai. Kemudian harus ada regulasi yang kuat, pasti, dan tidak menyulitkan, kesiapan pemprov dan pemkab, kesiapan dan keberanian sektor swasta dan dunia usaha untuk bergerak aktif.

Ia juga meminta masyarakat Aceh terutama masyarakat di kabupaten kota setempat siap mendukung pembangunan dan pengembangan pelabuhan. “Caranya, tidak boleh ada tekanan-tekanan, pungutan-pungutan, illegal fee, atau pajak nanggro harus dihentikan supaya ada ketertarikan investor dari luar agar mau masuk ke Aceh. Terpenting adalah mencipakan rasa aman, nyaman, bagi dunia usaha di Aceh. Termasuk tidak menetapkan cost tambahan dan berlipat ganda saat bongkar muat. Ini akan menyulitkan Aceh juga,” pungkas Nazar. (SI)

Senin, 26 Oktober 2009

LHOKSEUMAWE PORT INFORMATION



Welcome to the Edition of Lhokseumawe, Krueng Geukueh Port Information, Published special for those who needs information in port business.

Hopefully Port information brings you a fresh insight into the issues and development that concern port harbour and terminal those that supply relevant goods and sevices of activities.

I would like to take this opportunity to introduce also the new Port Management. I am very pleased to be port of the team entering the leading publication in its field.

Finally, I hope you enjoy this edition of Krueng Geukueh Port information and find it and find it usefull in the quest to concentrate in your core business objectives


Port of Lhokseumawe


Port of Lhokseumawe functions as export and import of raw materials for Industries specially for industrial zone in Lhokseumawe.


Location / Position

Port of Lhokseumawe is located in the North Coast of North Aceh Regency. Geographically it is on the position of.

05o – 10’ –15’’ North Latitude

07o – 09’ – 27 East Longtitude


The Hydrographic and Oceanography

a. Hydrographic

The coast along the port of Lhokseumawe is sloopy and sandy. The vessel should navigate carefully because there are submarine pipes of 63,3 miles long extending northwest ward from 05o-13’-25’’ NL / 97o-05’-52’’ EL until 05o-44’-28’’ NL/97o – 50’ – 13 EL.

b. Sea Tide

Highest High Water spring : 2,30 m HWS

Mean High Water Spring : 2,20 m MWS

Lowest Low Water Spring : 0,10 m LWS

Standard Time : GMT +700

Characteristics of Sea Tide : Mix Semi Diural

c. Current

The Current is weak and sometimes it seem near the shore, however it is frequenly influenced by seaward fix current along the coast. The maximum velocity of the current is 0,75 m/sec.


Condition and The Hinterland

The development of the port can not be separated from the development of oil and gas mining industry, fertilizers and papers industry

Besides there is a quick development of palm plantation which will be expected to be excellent non oil commodity.

The hinterlands also produce some agriculture commodities such as coffe, areca nut, chocolate, candlenut, and sea products.

Mean while it is still being prepared and industrial area (Pase Asia Industrial Area) which is about 15 kms from the port.

Access Road

Lhokseumawe port is about 17 Kms from the center of the city Lhokseumawe with its hot-mix road

Tourism Destination

a. Historial Malikul Saleh Tomb and Ning Tomb are about 50-60 Kms the port.

The tombs are the tombs of leaders and religious teachers when the Islame came to Aceh.

b. River tourism destination

1). Sawang of about 35 Kms from the port

2). Batee Iliek of about 60 Kms from the port

3). Krueng Simpuh of about 60 Kms from the port

c. Blang Kulam Waterfall of about 25 Kms from the port

d. Beach tourism destination which is well known as Bahagia (Happy) beach of about 60 Kms from the port.


The destination between port and regional port sector of IMT-GT


DISTANCE TABLE

Dari /From

Ke / To

Jarak (mil) / Distance (Mile)

Lhokseumawe

Malahayati

114


Belawan

76


Tanjung Balai Asahan

241




Lhokseumawe

Phuket

175




Lhokseumawe

Langkawi

176


Penang

200


Port Klang

295


Johor

522




Lhokseumawe

Singapore

492



LANDS

Lands use (Position june 2009)

Under it’s authority : 417.340 M2

For it’s own use : 74.163 M2

Being leases to other parties : 30.732 M2

Used by other institution : 3.916 M2

Untapped/Unutilized : 308.528 .5 M2


The Available facilitie in Port of Lhokseumawe

Chanel and Basin

No.

Uraian

Description

Panjang

Length

(M)

Lebar

Width

(M)

Luas

Area

(M2)

Kedalaman

Depth

(MLWS)

1

Alur / Chanel

2,5

250

625

10

2

Kolam / Basin

­-

-

­1.100.000

6 - 10


Berth in Krueng Geukueh

No.

Dermaga

Berth

Panjang

Length

(M)

Kedalaman

Depth

(MLWS)

Maximum

Maximum

DWT (Ton)






1

Umum / Public





a. Serba Guna / Multi Purpose

267,5

9

15.000


b. Dolphin/Curah Kering

80

6

5000


c. Dolphin Curah cair /Kering

45

9

10.000


d. Ro-ro

75

6







2

PT PIM





a. Dermaga Beton

105

9

15.000


b. Dermaga Curah

170

9

15.000






3

AAF





a. Dermaga Beton

300

9

15.000


b. Dermaga Curah

170

9

15.000

Open Storage

No.

Uraian

Description

Luas / Area

(M2)

1

Serba Guna /

Multipurpose

25.158


Passenger Terminal

No.

Uraian

Description

Luas

Area

(M2)

Kapasitas

Capacity

(Orang/Person)

1

Dalam Negeri/

Domestic

290

241

Warehouse

No.

Gudang

Warehouse

Ukuran (M)/

Dimension (M)

Gudang

Shed

Unit/ Unit

Luas / Area

(M2)

1

01

40x50

1

2000

2

02

30x20

1

600

4

Raphole

32x10

4

1280

4

Raphole

24x10

1

240


Equipment

No.

Uraian

Description

Kapasitas

Capacity

Jumlah

Total

1

Peralatan Apung

Floating Equipment

- Kapal Tunda / Tug Boat

- Kapal Pandu / Pilot Boat

- Kapal Pandu / Pilot Boat

- Kapal Kepil / Mooring Boat



2 x 1200 HP

2 x 135 HP

2 x 125 HP

105 HP



1 Unit

1 Unit

1 Unit

1 Unit

2

Peralatan Darat

Shore Equipment

Reachstacker / Reachstacker

Mobil Crane / Mobile Crane

Mobil Crane / Mobile Crane

Forklift / Forklift

Fotklift /Forklift

Forklift / Forklift



45 Ton

45 Ton

25 Ton

7 Ton

5 Ton

3 Ton



1 Unit

1 Unit

1 Unit

1 Unit

2 Unit

1 Unit

Electricity & Fresh Water

No.

Uraian

Description

Kapasitas

Capacity

1

PLN / State-Owned Electricity Company

155.5 KVA

2

Air Bersih / Fresh Water

15 Ton/h




NO

DESCRIPTION

RATE OF SHIP’S INDONESIAN FLAG (IDR)

RATE OF INTERNATIONAL LINER (US.$)

RATE OF INTERNATIONAL TRAMPER (US.$)

REMAKS







1

BERTHING DUES

62,40

0,096

0,144

GT/Call







2

WARFAGE

49,40

0,1032

0,1548

GT/Etmal







3

PILOTAGE






a. Fixed Rate

143.325

120

180

Ship/ Moving


b. Variabel Rate

73

0,06

0,09

GT/Ship/ Moving







4

TOWAGE






Ship Up To 3,500 GT






a. Fixed Rate

156.000

174

261

Ship/ Moving


b. Variabel Rate

2,6

0,0048

0,0072

GT/Ship/ Moving








Ship 3,501 Up To 8,000 GT






a. Fixed Rate

390.000

450

675

Ship/ Move


b. Variabel Rate

2,6

0,0048

0,0072

GT/Ship/ Moving








Ship 8,001 Up To 14,000 GT






a. Fixed Rate

617.500

684

1.026

Ship/ Move


b. Variabel Rate

2,60

0,0048

0,0072

GT/Ship/ Moving








Ship 14,001 Up To 18,000 GT






a. Fixed Rate

812.500

924

1.386

Ship/ Move


b. Variabel Rate

2,60

0,0048

0,0072

GT/Ship/ Moving








Ship 18,001 Up To 26,000 GT






a. Fixed Rate

1.300.000

1.464

2.196

Ship/ Move


b. Variabel Rate

2,60

0,0048

0,0072

GT/Ship/ Moving








Ship 26,001 Up To 40,000 GT






a. Fixed Rate

1.300.000

1.464

2.196

Ship/ Move


b. Variabel Rate

2,60

0,0048

0,0072

GT/Ship/ Moving








Ship 40,001 Up To 75,000 GT






a. Fixed Rate

1.300.000

1.560

2.340

Ship/ Move


b. Variabel Rate

2,60

0,0024

0,0036

GT/Ship/ Moving








Ship More75,000 GT






a. Fixed Rate

1.755.000

2.040

3.060

Ship/ Moving


b. Variabel Rate

2,60

0,0024

0,0036

GT/Ship/ Moving







5

FRESH WATER

42.000

7,00

7,00

Per Ton/m3






Notes :






Excluding Taxes






Value Added Taxes 10% (PPN 10%)